Sany 130902000017A Excavator cabin

1. Comfortable driving: ergonomic seats with adjustment in several directions, spacious space, reasonable layout of the working space and decrease in fatigue.

2. Protective protection: a high -strength frame structure equipped with a protective glass can effectively resist the impacts of falling objects and ensure the safety of the driver.

3. Accurate adaptation: sets up for various types of excavators, is easy to install and is completely compatible with the entire machine.



Product Details

Product representation

Detailed product information

Design: The frame is made of high -strength steel, which is resistant to deformation and shocks, and can also effectively protect the driver in unforeseen situations. The spacious interior of the cabin is ergonomically designed to facilitate the work of the driver with various governing bodies. Some models are also equipped with an adjustable seat with a suspension, which can be adjusted in accordance with the physique of the driver and driving habits in order to reduce fatigue during prolonged work.

Interior and configuration: when interior design, the main attention was paid to comfort and practicality, ecologically clean, fireproof and easily cleaned materials were used. The salon is equipped with a modern air conditioning system, which can automatically be adjusted depending on the ambient temperature, maintaining a comfortable temperature in the cab. At the same time, it is equipped with a high -definition panel and a working display, on which in real time the excavator’s working condition, information about faults, etc., which allows the driver to control the operation of the equipment is displayed.

Sound insulation and absorption of shocks: the use of soundproofing materials and sealing technologies allows you to effectively reduce the level of external noise and provide a quiet working environment for the driver. As for depreciation, in addition to the depreciation structure of the seat at the base of the cabin, shock absorbers from silicone rubber are also installed to reduce the effects of vibrations that occur during the excavator, on the driver.

The design of the viewing field: the large area of ​​hardened glass and the reasonable layout of the windows provide the driver with a wide viewing field, guaranteeing that the working area and the environment will be clearly visible during operation, which increases the safety and efficiency of work. Some models are also equipped with auxiliary devices, such as the heating of the rear -view mirrors and the control of blind areas, to further improve the field of vision.

Stages of installation

Preparation: Make sure that the excavator is stopped, the engine is turned off, and the negative terminal terminal is disconnected to prevent accidents during the installation process. Prepare the tools necessary for installation, such as wrenches, screwdrivers, taps, etc., as well as the cabin knot and related accessories corresponding to the excavator models.

Dismantle the old cabin (if any): use the tools, unscrew the bolts that attach the old cabin, carefully remove all types of lines and pipes connected to the old cabin, such as air conditioning systems, electric lines, etc., and mark them for accurate connection with the subsequent installation of a new cab.

Install the new cabin: using the tap, slowly lift the new cabin, align it at the installation site and make sure that the mounting holes are combined. Lower the cabin and pre -tighten the mounting bolts, but do not tighten them completely to ensure the subsequent adjustment of the position. In accordance with the previously marked provisions of the connections of lines and pipes, carefully insert each plug of the line into the appropriate interface of the new cab and insert it tightly to provide a good electrical connection; Connect air conditioning pipes, etc., provide a good seal without leaks.

Adjustment and fixation: adjust the position of the cabin so that it is set sustainably and meet the requirements of ease of operation and review. Then, using a dynamometric key, tighten the fixing bolts one at a time in accordance with the indicated puffing point to ensure a reliable installation of the cab.

Inspection and testing: check whether all lines and pipes are correctly connected, whether there are weakened or incorrect connections. Connect the negative pole of the battery, start the excavator, check the serviceability of the equipment inside the cabin, such as air conditioning, instrument panel, display screen, lighting, etc., check the operation of various control devices and their sensitivity and reliability.

Common malfunctions

The problem with sealing: after prolonged use, the cabin sealing stripes can get old, deform or damage, which can lead to the hit in the rain, dust, etc., which will affect the working environment of the driver and the normal operation of the equipment. Symptoms are the smell or leak of water in the cabin, as well as dust, which is clearly felt during the operation of the excavator.

A malfunction of electrical equipment: the electric system inside the cabin is relatively complex and can cause problems such as a short circuit, a chain break and burning out the fuse. For example, lighting devices are not included, the display on the instrument panel is faulty, the air conditioner does not cool and does not heat, etc. These malfunctions can be caused by the aging of the line, overload, poor contact, etc.

Seat malfunction: the seat adjustment function can fail, for example, the seat will not be able to be adjusted forward and backward and down or will not be able to adjust the angle of inclination of the back. This can be caused by damage to the adjustment mechanism, engine failure or damage to the control switch. In addition, the shocking effect of the seat can decrease with an increase in the use time, which affects the comfort of the driver.

Problems with vision: windshield can be cracked, scratched, etc., which affects the driver's overview. If the rear -view mirror is incorrectly adjusted or damaged, this will also affect the review of the environment by the driver. In addition, the malfunctions of the wipers, such as the fuzzy operation of the wipers and the engine failure, seriously worsen visibility in rainy or bad weather.

After -sales service

Warranty service: Sany usually provides a 1-2-year warranty period for the cabs of excavators. During the warranty period of the malfunction caused by the problems of product quality, such as deformation of the structural parts of the cabin, problems with the quality of the sealing stripes, the refusal of the components of the electric system, etc., can be replaced or replaced for free.

Technical support: If users are faced with problems during installation or use, they can call the Sanya unified national hotline. Professional specialists will provide detailed technical recommendations by phone to help users eliminate problems and solve problems. You can also get technical support through the online customer support service, the technical forum and other channels of the official Sany website.

Supply of accessories: Sanya has a complete system of deliveries of accessories and can supply original accessories for the cab, such as sealing tapes, electrical components, accessories for seats, glass, etc. Users can purchase suitable high -quality accessories through local dealers, service centers or official Electronic platform Sany commerce to guarantee the timeliness and quality of equipment service.

Maintenance: Sany has many authorized service centers throughout the country with a professional maintenance team and rich experience in serving excavators. When damaged the cabin, the user can send equipment to the nearest service center for repair. In some emergency situations or for large equipment, the service center can also provide repair services “from the door to the door”.


Preparation for installation

Safety measures and planning of the workplace: use personal protective equipment, such as protective helmets, protective gloves, protective shoes, etc., to avoid injuries during operation. Choose an even, firm and open place for parking an excavator and make sure that there are no obstacles around that could facilitate the operation of cranes and other equipment. At the same time, warning signs are installed around the object to prevent the penetration of unauthorized persons.

Preparation of tools and accessories: Prepare all the tools necessary for installations, such as the wrench of different specifications (united, horn, end), screwdrivers (cross, flat), pliers (sprouts, pliers), tap (select the appropriate lifting capacity in accordance with the weight of the weight in accordance with the weight Cabins), slings, dynamometric key, isolet, multimeter, etc. D. Check the list of products to make sure of the full configuration of the new cab of the Sany excavator and related accessories, including fasteners, sealing stripes, various pipelines, electric lines, interior details, etc. At the same time, check the appearance of the cabin for damage , deformations, scratches, etc. If there are any problems, contact To the supplier for timely replacement.

Preparations for the shutdown of the equipment and removing the old cab: turn off the excavator engine, turn on the manual brake and make sure that the equipment is stopped. Open the cover of the battery compartment, with the help of a wrench, unscrew the terminal nut on the negative terminal of the battery, remove the negative cable and wrap it with an insulating tape to prevent random contact with electricity. Mark all types of lines and pipes connected to the old cabin (if any), and write down their compounds and directions to facilitate the exact connection when the new cabin is subsequent. The marking method may consist of using a marker for marking the pipe or using the label to indicate the connection site on the pipe.

Remove the old cabin (if any)

Remove the fasteners: use a suitable wrench to unscrew the bolts that fix the old cab. These bolts are usually located at the junction of the lower part of the cab and the main case of the excavator. When tightening the bolts, be sure to weaken them gradually in diagonally to avoid deformation or damage to the cabin due to uneven effort. For some rusty or tightly tightened bolts, you can first spray the tool to weaken and wait for a while before twisting them.

Separate electrical circuits: carefully disconnect the electrical circuits connected to the old cab, including the power and signal lines of the dashboard, the display screen, lighting devices, control switches and other equipment. During the extraction process, first disconnect the fork. If the fork is tight, use the sharp drives to gently squeeze both sides of the fork and pull it out with uniform effort. Do not pull the wires with force so as not to damage the line. For some welded or fixed lines connection points, you need to use tools to carefully remove them, for example, use the wire ticks to remove the insulating layer, and then use the screwdriver to unscrew the screws and loosen the terminal.

Disconnect the pipes: remove air conditioning pipes, hydraulic pipes, etc., connected to the old cab. Before disconnecting the pipes, drop the pressure in the pipes to avoid injuries caused by injection of fluid under high pressure. For pipes of air conditioning system, you can use special equipment for collecting a refrigerant, and then use a wrench to unscrew the connecting nuts on the pipes and disconnect them. For hydraulic pipelines, first find the shutter valve of the pipeline, close it, and then with the help of a wrench, unscrew the connecting nut to disconnect the pipeline. After disconnecting the pipeline, timely close the junction of the pipeline with a plug to prevent dust and pollution from getting into the pipeline.

Lifting the old cab: Use the crane to slowly raise the old cab. During the upsurge process, make sure that the slings are in the correct position to avoid the tilt or shaking of the cab. At the same time, to ensure the safety of the rise process, it is necessary to appoint a responsible person who will lead the work of the crane. The old cabin rises to a specially designated place for storage and proper conservation or disposal.

Installation of a new cab

Rise of a new cab: use a crane to slowly raise a new cab. During the rise process, make sure that the cabin maintains balance and avoid clashes with surrounding objects. Raise the new cab over the installation site and adjust the position so that the mounting holes of the cab coincides with the mounting holes on the excavator housing.

First, secure the cabin: slowly lower the cab so that the fasteners pass through the fasteners in the lower part of the cab and fasteners on the excavator case, then put the goals and nuts on the bolts and tighten the nuts first, but do not tighten them completely so that you can subsequently adjust them to adjust them The position of the cab. When tightening the nuts, make sure to tighten them gradually, diagonally to ensure uniform load on the cab.

Connect electric lines: in accordance with the previously designated positions of the lines, alternately connect the electric lines of the new cab to the electrical system of the excavator case. When connecting, make sure that the fork is inserted all the way and the click means that the fork is inserted reliably. For some terminal pads with a screw mount, insert the wires into the terminal holes and tighten the screws with a screwdriver to make sure that the wires are securely connected and have good contact. When connecting electric circuits, carefully check the connection of each circuit to make sure that there are no incorrect or missing connections. After the connection is completed, you can use the multimeter to check the electric circuit and make sure of its normal conductivity.

Connect the pipes: according to the previously marked pipe connecting positions, connect the air conditioning system in turn, hydraulic pipes, etc. The new cabin to the corresponding pipes of the excavator body. When connecting, make sure that the connection place of the pipes is clean, without dust and pollution. For pipelines of air conditioning system after completion of connection, use equipment for refueling with a refrigerator to add a refrigerant and check the pipelines for leaks. For hydraulic pipelines after the connection is completed, open the shut -off valve and check if the pipeline is free and whether there are leaks.

Adjust and fix the cabin: use the alcohol level to check the horizontality of the cabin and support it evenly, adjusting the tightening of fasteners. At the same time, check if the gap between the cabin and the excavator case is uniform. If there are bumps, you can adjust them with gaskets. After adjusting the position of the cab, tighten the fasteners on one dynamometric key in accordance with the indicated puffing point to ensure a reliable installation of the cab. When tightening the bolts, tighten them again diagonally to provide an uniform tightening force of each bolt.

Install the internal components: install seats, dash panels, display screens, control switches, internal panels and other components inside the cab. During the installation process, follow the requirements of the operating manual to guarantee the correct and reliable installation of the components. After installation, check the performance of the internal components, for example, the function of adjusting the seat, the function of displaying information on the instrument panel, the function of operation of the control switch, etc.

Checking and testing

Checking the appearance: after installation, carefully inspect the appearance of the cabin to make sure that all the parts are installed correctly and reliably, without any backlash, falling away or damage. Check whether the sealing strips of the cabin are installed, whether the seal is well performed, whether there are no gaps or missing parts. Check whether the glass is reliably installed in the cab, is there any damage, scratches, etc.

Checking the electric system: Connect the negative terminal terminal, start the excavator and check if the electric system is correctly working inside the cab. Check if the indicators on the instrument panel burn and are the readings of various devices, such as the engine tachometer, the oil temperature indicator, the oil pressure indicator, etc. Check if the display screen is displayed, and whether the menu and functions work on the screen. display. Check whether lighting devices are burning normally and whether the brightness of the light meets the requirements. Check if the operation of control switches, such as the starter, the flame break switch, various control handles, etc., is sensitive and reliable. When checking the electrical system, pay attention to the presence of abnormal heating, smoke, smell, etc. If you detect any deviations, immediately stop the check and find out the cause of the malfunction.

Checking the pipeline system: check whether the air conditioning system works correctly, whether a good effect of cooling or heating is provided, whether there is a smell or extraneous noise at the air output. Check if the hydraulic system works normally, whether there are leaks in the pipeline and whether the pressure of hydraulic oil meets the requirements. When checking the pipeline system, pay attention to the presence of oil or air leakage in the connecting parts of the pipeline. If there is a leak, it should be eliminated in a timely manner.

Operational tests: run the excavator and perform several simple test actions, such as digging, rotation, walking, etc., to check the convenience of control and visibility of the cab. During work, pay attention to the presence of abnormal vibration, noise or shaking in the cab. If there are any deviations, check the cause of the malfunction in a timely manner. At the same time, it should be checked whether the driver is convenient to work in the cab, whether various controls are reasonably located, whether the field of view is widely.



High-quality cabin of the excavator SY55-60PRO 130902000017A new parts of the Sany construction equipment for excavators SY55 and SY60

Exhibition cabinets

Exhibition cabinets


Acquaintance with the plant

The plant operates a team of highly qualified and experienced engineers who continuously introduce technological innovations and improve products. Currently, the company has a number of independent intellectual property rights and patented technologies. The manufactured construction equipment includes a wide range of equipment such as excavators, loaders, taps, bulldozers and other machines. Products are highly productivity, reliability, energy efficiency and environmental friendliness, as well as the ability to adapt to difficult operating conditions in various climatic and working media around the world.

Acquaintance with the plant


Awards and fightsFixation

Awards and qualifications

frequently asked questions


1. In which countries are we exporting?


Asia: Vietnam, India, Indonesia, Pakistan, Kazakhstan, Uzbekistan, etc.

Europe: Russia, Belarus, Ukraine, Lithuania, Saudi Arabia, etc.

South America: Brazil, Chile, Paraguay, Argentina, etc.

Africa: South Africa, Ethiopia, Libya, etc.


2. What kind of payment conditions can we accept?


Usually we can work on T/T, 30% TT before production and 70% TT before shipping


3. What ways can we work for delivery?


1) for most countries in Europe, South America and Africa, etc. We can go along the container or Roro through the ocean freight.

2) for neighboring countries of China, such as Russia, Vietnam, Kazakhstan, Uzbekistan, etc. We can deliver by road or railway.

3) for light spare parts in the urgent requirement, we can send it using the international courier service, such as DHL, TNT, EMS or other air transportation.


4. How can you guarantee that you delivered goods to customers?


A: We will provide you with complete information about delivery for you.


5. What are our advantages compared to other manufacturers/factories?


1) Reliable quality: we carefully choose permanent manufacturers to support spare parts, such as engines, bridges, transmission, and many parts developed and produced by us always adapting the best materials.

2) a competitive price: the concentration of mechanized production in large quantities reduces production costs to ensure a competitive price.


3) The service team: firstly, our sales managers work 24 hours a day, are ready to answer your questions at any time. Secondly, a professional training team with senior equipment, ready to provide support services to users and dealers. Most problems can be solved within 24 hours.

4) Fast delivery: As a rule, we can deliver within 10 working days at the plant after receiving prepayment from customers.


6. How can you provide customers after sales service?


A: We will answer you at first and help you solve problems within 24 hours. If we really need your local, we

We will send your professional person to your settlement to help you solve problems without any fluctuations, supply you with comprehensive

Leave your messages

Related Products

x

Popular products

x
x